Skip to content
← All calculators

Labor Cost Percentage Calculator

Labor cost percentage is your total labor spend — wages, taxes, and benefits — divided by sales for the same period. It's half of your prime cost and usually the half operators have the most control over week to week.

Enter labor cost and sales for the same period to see your percentage.

The formula

Labor cost % = total labor cost ÷ total sales × 100

A worked example

A casual full-service spot does $45,000 in a week. Payroll for the week — hourly wages, the salaried kitchen manager's week, payroll taxes, and benefits — totals $14,000. Labor cost is 31.1%: inside the normal 30–35% range for the concept, but worth watching.

The common mistake

Cutting hours before finding out where the hours go. If the percentage is high and the team never stops moving, the schedule usually isn't the problem — prep planning or the building is. We've seen a bad layout burn two hours of labor per shift on walking alone.

Frequently asked questions

What is a good labor cost percentage for a restaurant?

Quick service typically runs 25–30%, casual full service 30–35%, and fine dining 35–40% because of higher service staffing. Judge your number against your concept, not a universal target.

Should payroll taxes and benefits be included in labor cost?

Yes. Payroll taxes, workers' compensation, and benefits are real labor costs, typically adding 10–15% on top of wages. Excluding them makes your number look better than it is.

My labor percentage is high but my team is always busy. Why?

Busy isn't the same as productive. Bad kitchen layout, poor prep planning, and service bottlenecks force teams to work hard on wasted motion. Watch where the hours actually go before cutting them.

Is it better to track labor cost daily or weekly?

Weekly against weekly sales is the standard health check, but a daily glance during scheduling helps you catch problems in real time — especially on historically slow days.

More free tools

Numbers looking rough? That's what we do.

High labor numbers are usually a symptom, not the disease. We find the cause on the floor — scheduling, prep, or layout.

Talk to us